Hello everyone, could an upgrade be performed from version 4.2.1.4 to 4.2.1.15 on a machine running CentOS 8.4 in a production environment with three cluster nodes and an RPM installation be performed?
Or is a migration necessary because the OS needs to be changed to Linux 9 versions?